Wednesday, June 22, 2011

Pool Construction: Day 7 & 8

June 17th & 18th

Pipes were laid out in the trench.

They put gravel around the outside of the walls and over the area that will be the patio.

Framing was built to get ready for the concrete slab and patio to be poured.

Day 8 was a rain day so no progress was made.

But my Elijah didn't let that stop him from having a good time. He gave the pool a trial splash while the men were away.

The rains were so heavy the night before that more than 2 feet of muddy water accumulated.